Chicago Electric 65712 manual See Figure K

Models: 65712

1 31
Download 31 pages 20.05 Kb
Page 15
Image 15

FIGURE K

PIN (51)

R-PIN

(52)

RAIL (35)

PIN (51) R-PIN (52)

PACKAGING

MATERIAL

13.Position the Garage Door Opener on the garage floor below the unit’s previously installed Header Bracket (54). Use product packaging material to protect the Housing (31). Raise the Rail (35) until the two holes at the end of the Rail align with the two holes in the Header Bracket. Secure the Rail to the Header Bracket using a Pin (57). Insert an R-Pin (58) in the Pin to secure the Pin in place.

(See Figure K.)

Note: To enable the Rail to clear sectional door springs, it may be necessary to lift the Garage Door Opener onto a temporary support. The Garage Door Opener must be secured to a support or held firmly in place by another person.

FIGURE L

1”

BOARD

14.A 1” thick board is ideal for setting the proper door-to-Rail (35) distance. Raise the Garage Door Opener onto a stepladder. Open the garage door. Place the 1” thick board, laid flat, on the top section of the garage door near the center line. Rest the

Rail on the board. NOTE: If the raised garage door hits the unit’s Trolley (45), pull down on the Trolley Release Arm to disconnect the inner and outer Trolley sec-

SKU 65712

For technical questions, please call 1-800-444-3353.

Page 15

Page 15
Image 15
Chicago Electric 65712 manual See Figure K