Installation Instructions | XSM/XTM Series |
| 5 | 6 |
7 |
|
|
(LC) x 4 |
|
|
10 |
|
|
8 | 9 |
|
| (LB) x 4 |
|
Figure 2
8.Mark the attachment points for the lower mounting slots, making sure the attachment points are located on the studs. (See Figure 2)
9.Drill 7/32" pilot holes at markings for lower mounting holes. (See Figure 2)
10.Use two 5/16 x
11.Slide rails to approximate center of screen location.
12.Proceed to Attaching Interface Brackets to Display section.
Installing to a Concrete Wall
CAUTION: MINIMUM HORIZONTAL DISTANCE BETWEEN WALL BRACKETS IS 24" (609.6mm). Do not place mounting brackets closer together than 24" (609.6mm).
1.Determine the center of the display, and where it should be located on the wall.
2.Line up the notches on mount with center of screen marking to determine vertical center. (See Figure 1)
3.Measure up
4.Using a level, mark the wall through both upper mounting slots. (See Figure 3)
WARNING: ELECTRICAL SHOCK HAZARD! CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY! ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing fasteners.
WARNING: EXPLOSION AND FIRE HAZARD! CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY! ALWAYS make certain area behind mounting surface is free of gas, water, waste, or any other plumbing before cutting, drilling, or installing
fasteners. |
|
|
| |
6 | 10 | (LA) x 4 | 4 | 8 |
| x4 | |||
|
|
|
| |
|
|
| 5 | 9 |
7 | 11 | (LC) x 4 | (LB) x 4 |
|
|
|
|
|
Figure 3
5.Drill one 5/16" pilot hole at each marking. (See Figure 3)
6.Install an anchor (LA) into each pilot hole using a hammer. (See Figure 3)
7.Use two 5/16 x
8.Mark the attachment points for the lower mounting slots. (See Figure 3)
9.Drill one pilot hole at each marking for lower mounting holes. (See Figure 3)
10.Install an anchor (LA) into each pilot hole using a hammer. (See Figure 3)
11.Use two 5/16 x
12.Slide rails to approximate center of screen location.
7