Cisco Systems 4490 appendix Installing the Chassis on a Workbench or Tabletop, 3-13

Models: 4490

1 20
Download 20 pages 33.28 Kb
Page 13
Image 13
Installing the Chassis on a Workbench or Tabletop

Chapter 3 Installing the Cisco Global Site Selector 4490

Installing Your Unit

Installing the Chassis on a Workbench or Tabletop

When you install a Global Site Selector 4490 on a workbench or tabletop, ensure that the surface is clean and in a safe location and that you have considered the following:

The chassis should be installed off the floor. (Dust that accumulates on the floor is drawn into the interior of the chassis by the cooling fans. Excessive dust inside the GSS 4490 can cause overtemperature conditions and component failures.)

There must be approximately 19 inches (48.26 cm) of clearance at the front and rear of the chassis for accessing network cables or equipment.

The GSS 4490 must receive adequate ventilation (it is not being installed in an enclosed cabinet where ventilation is inadequate).

Follow these steps to install the GSS 4490 on a workbench or tabletop:

1.Remove any debris and dust from the tabletop or workbench, as well as from the surrounding area. Also make sure that your path between the GSS 4490 and its new location is unobstructed.

2.Attach the rubber feet to the bottom of the chassis. The rubber feet have an adhesive backing. Peel the protective tape off the adhesive and stick the feet to the bottom of a clean chassis surface. Place one foot in each corner.

3.Place the chassis on the tabletop or workbench.

4.Ensure that no exhaust air from other equipment will be drawn into the chassis. Also, ensure that there is adequate clearance at the front and rear of the chassis.

 

 

Cisco Global Site Selector 4490 Hardware Installation Guide

 

 

 

 

 

 

78-15755-01

 

 

3-13

 

 

 

Page 13
Image 13
Cisco Systems 4490 appendix Installing the Chassis on a Workbench or Tabletop, 3-13