![](/images/new-backgrounds/1170360/17036025x1.webp)
Install the Hardware
Install Power Supplies in the Router
A |
| B |
|
DC | FAN OUTPUT |
| |
|
| ||
OK | OK | FAIL |
|
|
| ||
|
| AC FAN OUTPUT |
|
|
| AC | FAN OUTPUT |
|
| OK OK FAIL | |
|
| OK | OK FAIL |
|
| POWER |
|
| I | A | POWER |
|
| ||
|
| B | |
0 |
| I | |
| 0 | I | |
|
| ||
|
|
| |
|
| 0 |
|
|
| Captive screws | 53427 |
Note The Cisco 7513 and the Cisco 7576 routers are shipped with the power supplies removed. Each chassis comes with one power supply as standard equipment; a second power supply is optional equipment. The power supplies rest on the floor of the chassis under the card cage assembly.
This procedure applies to
Step 1 For
For
Step 2 Hold the power supply by the handle and place your other hand underneath it.
Caution Use two hands to remove and install power supplies.
Step 3 Place the power supply inside the bay, and align it to go straight into the bay.
Step 4 Push the power supply back into the bay until its front panel is flush with the chassis rear panel.
Step 5 Use a screwdriver to tighten the captive installation screw on the top of the power supply.
For
11