Chapter4 Deploying the C65/76M
Deployment and Commissioning Process
4-48
Cisco 6500/7600 Manager UserGuide
OL-2209-01
Switch Fabric Module
To predeploy a Switch Fabric Module, choose the Deployment > Deploy
Supervisor/Control Module(s) option in the pop-up menu from the Chassis
object (see Figure 4-35).
Figure 4-35 Predeploying Switch Fabric Modules