Installing the SP and RP Memory Upgrade Kit
Vertical slots
a.Position the supervisor engine in the slot. (See Figure 8.) Make sure that you align the sides of the module carrier with the slot guides on the top and bottom of the slot.
b.Carefully slide the supervisor engine into the slot until the EMI gasket along the right edge of the module makes contact with the module in the slot adjacent to it and both ejector levers have closed to approximately 45 degrees with respect to the module faceplate. (See Figure 9.)
Figure 8 | Positioning the Module in a Vertical Slot Chassis |
Ejector lever fully extended
FAN
STATUS
o
o
INPUT | FAN | OUTPUT |
OK | OK | FAIL |
INPUT | FAN | OUTPUT |
OK | OK | FAIL |
SUPERVISOR | WS- SUP 72 |
720 |
|
WITH |
|
INTEGRATED |
|
SWITCH |
|
FABRIC |
|
. |
|
EMI
gasket
EMI
gasket
Insert module between slot guides
6
43
91529
Supervisor Engine 720 Switch Processor and Route Processor Memory Installation Note
18 |
| |
|