Cisco Systems MEM-MSFC3-1GB= manual Gap between the module EMI gasket and the module above it 1mm

Models: MEM-MSFC3-1GB= MEM-S3-1GB= MEM-S2-512MB= MEM-MSFC2-512MB=

1 32
Download 32 pages 27.66 Kb
Page 19
Image 19
Gap between the module EMI gasket and the module above it

Installing the SP and RP Memory Upgrade Kit

Figure 9

Clearing the EMI Gasket in a Vertical Slot Chassis

Gap between the module EMI gasket and the module above it

1mm Press left

FAN

STATUS

Press left

Press left

o

oManual background

INPUT FAN OUTPUT

FAIL

INPUT FAN OUTPUT

FAIL

SUPERVISOR

WS- SUP 72

720

 

WITH

 

INTEGRATED

 

SWITCH

 

FABRIC

 

.

 

91530

c.Using the thumb and forefinger of each hand, grasp the two ejector levers, and exert a slight pressure to the left, deflecting it approximately 0.040 inches (1 mm) creating a small gap between the supervisor engine’s EMI gasket and the module adjacent to it. (See Figure 9.)

Note Do not exert too much pressure on the ejector levers because they will bend and be damaged.

d.While pressing down on the ejector levers, simultaneously close the levers to fully seat the supervisor engine in the backplane connector. The ejector levers are fully closed when they are flush with the module faceplate.

Supervisor Engine 720 Switch Processor and Route Processor Memory Installation Note

 

78-15538-02

19

 

 

 

Page 19
Image 19
Cisco Systems MEM-MSFC3-1GB= manual Gap between the module EMI gasket and the module above it 1mm, Press left Press left