2-12
Catalyst 2960-S Switch Hardware Installation Guide
OL-19732-04

Chapter 2 Switch Installation

Installing the Switch

Use four Phillips flat-head screws to attach the long side of the bracket to each side of the switch (Figure 2-12).

Figure 2-12 Attaching Brackets for 19-inch Racks

1Front-mounting position 3Mid-mounting position2Number-8 Phillips flat-head screws (48-0655-01)4Rear-mounting position