36
CiscoXR 12000 Series Router Ethernet Line Card Installation
OL-7861-01
Removing and Installing SFP Modules
Figure28 Removing a Slide Tab SFP Module
Step6 Place the removed SFP module on an antistatic mat, or immediately place it in a static shielding bag if
you plan to return it to the factory.
Step7 Protect your line card by inserting clean SFP module cage covers into the optical module cage when
there is no SFP module installed.
Installing a Slide Tab SFP Module
To install this type of SFP module into a line card, follow these steps:
Step1 Attach an ESD-preventive wrist or ankle strap and follow its instructions for use.
Step2 Hold the SFP module with the hardware label facing up.
Caution The SFP module must be inserted with the hardware label facing up to avoiding damaging the module
or the line card.
Step3 Insert the SFP module into the appropriate slot and gently push on it until it snaps into the slot tightly.
(See Figure 29.)
84650
ACTIVE
CARRIER
RX PACKET
WRAP
PASS THRU
3
4OC48/SRP-SFP