Connecting Electrical Service

(Presses With Timers Only)

The following steps outline the procedure for connecting electric service:

1.Install a suitably sized fused disconnect switch or circuit breaker as close to press as practical.

2.Remove one knockout plug from electrical connection box.

3.Connect proper size conduit encased wires to wires inside box.

4.Connect conduit to box.

NOTE: Refer to wiring schematic enclosed in control panel.

Final Preparation for Use

NOTE: Press passed a thorough inspection before it was shipped; however, due to vibration encountered during shipment, some cap screws, nuts, screws or fittings may have loosened.

After press is installed, all covers and guards should be removed and the following performed:

WARNING

To avoid possible serious injury, BEFORE making final check-out:

ALWAYS shut off services to press BEFORE removing guards and covers to do ANY maintenance, service, setup, adjustments or repair tasks.

Shut off AND lock out ALL electric power to press.

Shut off AND lock out ALL air service to press.

Shut off AND lock out ALL steam service to press.

Let heated surfaces cool.

W337

Installation

Check all bolts, nuts, screws, tru-arc rings, terminals and fittings for security and tighten as required.

Check oil level in air line oiler. It should be

3/4 full (approximately 1/2 inch [12.7 mm] from top).

Check air tubing. It should be clear of steam lines and moving parts.

Check that foot pedals can be fully depressed (no carpet, rubber pads, etc., under pedals to restrict movement).

Final Check-Out Procedure

The following paragraphs outline check-out procedures for properly operating mechanical, air, electrical and steam systems.

FAILURE to perform requested checks and make corrective actions as required could result in damage to the press.

NOTE: Refer to Operation/Maintenance Manual to identify controls before performing the following check-outs.

Mechanical and Air System Check-Outs

1.Open air supply shut-off valves.

2.Simultaneously push and hold both CLOSE pushbuttons until head is against buck. Head should continue downward until padding is squeezed. Pressing pressure is now applied.

3.Push OPEN button. Head return springs should pull head open.

4.Simultaneously push both CLOSE buttons. As head travels downward, release left button. Head should return open.

5.Simultaneously push both CLOSE buttons. As head travels downward, release right button. Head should return open.

6.Simultaneously push both CLOSE buttons. Have a second person press the OPEN button as you continue pressing the CLOSE buttons. Head should return open.

7.If buttons do NOT perform as described above, DO NOT operate the press. Call a qualified service technician.

AJ1031

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

19