Operator’s Manual |
8.On all steamcoil units, the incoming steam pressure must be
9.Check that the drain lines meet installation requirements specified in installation paragraph 4
WARNING
INJURY TP PERSONNEL AND EQUIPMENT DAMAGE may result from an improper installation.
10.After completing checks 1 through 9, correct any deficiencies refer to the
11.Check to ensure that the water in the boiler sight gauge glass automatically stays about 1/3 full when boiler is started up and operated.
12.Check to ensure that the steam pressure gauge registers 10 psi. The steam pressure is
Factory setting may shift due to shaking in transit and resetting will be required after installation. Proper ad- justments and maintenance procedures am detailed on a separate data sheet entitled "Steam Pressure Adjust- ments." Adjustments should be made only by qualified service personnel- the factory pressure settings shown in the accompanying chart should never be exceeded.
GAUGE PRESSURE READING WITH NO STEAM FLOW* (STATIC PRESSURE)
Operating Pressure Switch | 10 psi |
High Limit Safety Pressure Switch | 15 psi |
|
|
Operating Pressure Switch | 10 psi |
High Limit Safety Pressure Switch | 15psi |
Steam Supply Pressure Range | |
|
|
Steamer Pressure Reducing Valve | 10 psi |
Steam Supply Pressure Range | 1545 psi |
** With or without kettle |
|
______________________________________________________________________________ 6