Installation Overview and Planning

3

Planning Your Installation

The software installation procedure is broken down into 6 basic steps, including the planning described in this chapter. The following brief descriptions of the basic steps do not by themselves provide enough information for you to fill in the planning worksheets presented in Appendix B of this document; you should also read the chapters pertaining to the individual worksheets for full information. If you fill in the worksheets and perform the procedures presented in Chapters 2 through 6 in order, the installation should go smoothly.

Step 1. Complete Worksheets

The worksheets in Appendix B will help you determine which server resources must be installed/configured for the planned installation. Each worksheet pertains to one of the categories of network resources. Steps 2 through 6 below provide brief summaries of the configuration process, and Chapters 2 through 6 provide details pertaining to each corresponding step.

Note

Read the instructions presented in the chapter pertaining to a worksheet before filling in the worksheet. This will enable you to proceed smoothly through the remaining steps of this procedure.

Step 2. Configure Terminal Start-Up Resources

There is a minimum set of server resources that must be configured for using a T1500 Windows-Based Terminal. Some of the resources are required in a network- boot environment, some are required in a local boot environment, and others are strongly recommended for either environment.

Fill out the worksheet for Step 2 in Appendix B and use the instructions in Chapter 2 to configure terminal start-up resources.