Conair 0.25 to 1.5 ton Table Of Contents, General, Installation, Operations Sequence, Maintenance

Models: 0.25 to 1.5 ton VL Series

1 44
Download 44 pages 57.37 Kb
Page 3
Image 3
TABLE OF CONTENTS

TABLE OF CONTENTS

 

 

1.0

GENERAL

5

 

1.1

Unit location

6

 

1.2

Efficiency

6

 

1.3

Safety

6

 

1.4

Clean air act

6

 

1.5

Miscellaneous

7

2.0

INSTALLATION

9

 

2.1

General

10

 

2.2

To and From process connections

10

 

2.3

Unit drain

11

 

2.4

Air-cooled condenser

11

 

2.5

Electrical connection

12

3.0

OPERATIONS SEQUENCE

13

 

3.1

General

14

 

3.2

Start up / operations procedure

14

 

3.3

Instrument operation

15

 

3.4

Shut down / disconnect sequence

18

4.0

TROUBLESHOOTING

19

 

4.1

Unit will not start

20

 

4.2

Pump will not start

20

 

4.3

Compressor will not start

20

 

4.4

Unit shuts down on high pressure switch

20

 

4.5

Unit shuts down on low pressure switch

20

5.0

MAINTENANCE

23

 

5.1

Warranty service procedure

24

 

5.2

Periodic preventative maintenance

24

 

5.3

Special maintenance

25

 

5.4

Pump repair

25

6.0

COMPONENTS

27

 

6.1

Water system

28

 

6.2

Refrigeration system

28

7.0

RELATED DRAWINGS

29

 

7.1

Electrical (typical)

30

 

7.2

Circuit schematic

31

8.0

APPENDIX

33

 

8.1

Specifications

34

 

8.2

Operations below 48°F

35

 

8.3

Water quality control

37

 

8.4

Inhibited propylene glycol

37

 

8.5

Chiller capacity and derate chart

39

 

8.6

Pressure - temperature chart for R-22

40

 

8.7

Engineering formulas

41

 

8.8

Spare parts list

42

UGH020/0301

VL Series Portable Chillers, 0.25 to 1.5 Tons

Page: 3

Page 3
Image 3
Conair 0.25 to 1.5 ton manual Table Of Contents, General, Installation, Operations Sequence, Troubleshooting, Maintenance