!
SAFETY FOR LIFE
PRODUCT INFORMATION
Introduction
Service Information
Read This Manual First
Read and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment.
Additional Information
These instructions cannot cover all details or variations in the equipment, procedures, or process described, nor to provide directions for meeting every possible contingency during installation, operation, or maintenance. For additional information, contact your Cooper Power Systems representative.
Acceptance and Initial
Inspection
Handling and Storage
Use care during handling and storage of the control. If the control is to be stored for any length of time prior to installation, provide a clean, dry storage area to minimize the possibility of mechanical damage.
ANSI Standards
Kyle reclosers are designed and tested in accordance with ANSI standards C37.60 and C37.85 and ANSI guideline C37.61.
Quality Standards
The Quality System at the Cooper Power Systems, Kyle Distribution Switchgear plant is ISO 9001 certified.
ISO 9001
CAN/CSA ISO 9001
BS EN ISO 9001
ANSI/ASQC Q9001
Each Type S control is completely assembled, tested, and inspected at the factory. It is carefully calibrated, adjusted, and in good condition when accepted by the carrier for shipment.
Upon receipt, inspect the carton for signs of damage. Unpack the control and inspect it thoroughly for damage incurred during shipment. If damage is discovered, file a claim with the carrier immediately.
3