Table 4.2: Clearances From Vent Piping To Combustible Construction

 

 

 

MINIMUM CLEARANCE

 

 

 

TO COMBUSTIBLE

TYPE OF VENT PIPE

PIPE DIRECTION

ENCLOSURE

MATERIAL

80/125 and 60/100mm

VERTICAL OR

ENCLOSED ON ALL FOUR SIDES

0”

CONCENTRIC VENTING

HORIZONTAL

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

AT LEAST ONE SIDE OPEN,

 

PROTECH FASNSEAL

VERTICAL OR

1”

COMBUSTIBLE MATERIAL ON A

Z-FLEX Z-VENT III

HORIZONTAL

 

MAXIMUM OF THREE SIDES

 

METAL-FAB CORR/GUARD

 

 

 

 

 

 

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

HORIZONTAL OR VERTICAL

ENCLOSED ON ALL FOUR SIDES

2-1/2”

Z-FLEX Z-VENT III

WITH OFFSETS

 

 

 

METAL-FAB CORR/GUARD

 

 

 

HEAT FAB SAF-T VENT

 

 

 

PROTECH FASNSEAL

VERTICAL WITH NO OFFSETS

ENCLOSED ON ALL FOUR SIDES

2-1/2”

Z-FLEX Z-VENT III

 

 

 

 

METAL-FAB CORR/GUARD

 

 

 