Table 4.2: Clearances From Vent Piping To Combustible Construction
|
|
| MINIMUM CLEARANCE | |
|
|
| TO COMBUSTIBLE | |
TYPE OF VENT PIPE | PIPE DIRECTION | ENCLOSURE | MATERIAL | |
80/125 and 60/100mm | VERTICAL OR | ENCLOSED ON ALL FOUR SIDES | 0” | |
CONCENTRIC VENTING | HORIZONTAL | |||
|
| |||
|
|
|
| |
HEAT FAB |
| AT LEAST ONE SIDE OPEN, |
| |
PROTECH FASNSEAL | VERTICAL OR | 1” | ||
COMBUSTIBLE MATERIAL ON A | ||||
HORIZONTAL |
| |||
MAXIMUM OF THREE SIDES |
| |||
|
| |||
|
|
| ||
|
|
|
| |
HEAT FAB |
|
|
| |
PROTECH FASNSEAL | HORIZONTAL OR VERTICAL | ENCLOSED ON ALL FOUR SIDES | ||
WITH OFFSETS |
| |||
|
| |||
|
|
| ||
HEAT FAB |
|
|
| |
PROTECH FASNSEAL | VERTICAL WITH NO OFFSETS | ENCLOSED ON ALL FOUR SIDES | ||
| ||||
|
|
| ||
|
|
|
5