9)Pitch of Horizontal Piping - Pitch all horizontal piping so that any condensate which forms in the piping will run towards the boiler:

Pitch Crown horizontal concentric venting 5/8” per foot

Pitch Stainless steel venting 1/4” per foot.

10)Supporting Pipe - Vertical and horizontal sections of pipe must be properly supported:

Support Crown concentric venting near the female end of each straight section of pipe.

Exception: Vertical runs of concentric pipe in an unused chinmey (Figure 7.36) need only be supported at the terminal and at the base of the run.

• Support stainless steel venting as called for by the vent manufacturer’s instructions.