6)Vertical Terminal Installation - In addition to the vertical terminal, either a Flat Roof Flashing (PN 230533) or Sloped Roof Flashing (PN 230535) is required for this installation.

a)Determine the center line of the terminal location on the roof. If the roof is flat, cut a 5-1/2” diameter hole for the terminal. If the roof is sloped, cut a hole large enough for the terminal to pass through the roof while remaining plumb. Caution: If the boiler is installed directly under the hole, cover it while cutting the hole to prevent saw dust and other debris from falling into the boiler.

b)Install the roof flashing using standard practice for the roofing system on the structure.

c)If not already done, assemble the venting system inside the building. The last section of pipe needs to be on the same center line as the terminal and within 19-1/4” of the top edge of the roof flashing (Figure 7.35a).

d)Measure distance “H” from the top edge of the storm collar to the end of the last fitting as shown in Figure 7.35a.

e)Add 1” to distance “H”. Carefully mark this length on the pipe as shown in Figure 7.35b.

f)Cut the outer pipe only at the point marked in Step (e) using aviation shears, a hacksaw, or an abrasive wheel cutter. Be careful to cut the pipe square. De-burr the cut end with a file or emery cloth.

g)Place a mark on the aluminum inner pipe 3/8” beyond the end of the outer pipe (Figure 7.35b). Use a fine tooth hacksaw to cut the aluminum pipe and be careful to cut the pipe square. De-burr the cut edge of the aluminum pipe with a file or emery cloth.

h)Make a mark on the terminal section 1” from the cut end of the outer pipe as shown in Figure 7.35b.

i)Slip the terminal section through the roof from the outside. Push into the last section of vent pipe until the mark the mark made in Step (h) is not longer visible. Secure the terminal to the last piece of pipe with three #10 x 1/2” sheet metal screws. Drill a 1/8 hole through both outer pipes to start these screws. Use a drill stop or other means to ensure that the drill bit does not penetrate more than 3/8” into the outer pipe. Do not use a sheet metal screw longer than 1/2”.

j)Secure the terminal section to the inside of the roof structure using the mounting bracket provided with the terminal Figure 7.35c).

7)Chimney Chase Installation - A vertical 80/125mm vent system can be installed in an unused masonry chimney. This installation is similar to other vertical installations with the following exceptions (Also see Figure 7.36):

a)The chimney chase elbow kit (PN230530) is used at the base of the chimney. This kit consists of a support elbow and a mounting bracket. Slip the elbow over the M10 x 35 screw in the support bracket. Determine the desired vertical location of the support elbow in the chimney and mark the location of the pin on the back of the support bracket on the back wall of the chimney. Drill a 7/16”dia x 2-1/2” deep hole at this location to support the back of the bracket. The front of the elbow mounting bracket is supported by the bottom of the opening into the chimney or by an installer supplied bracket.

b)Construct a weather-tight flat roof to cover the top of the old chimney. Install the vertical terminal through this roof using the flat roof flashing.

Figure 7.35a: Dimension “H”

30

Page 32
Image 32
Crown Boiler MWC116ELL, MWC Series, MWC116ENL, MWC116ENT, MWC116ELT manual 35a Dimension H

MWC116ENL, MWC116ELL, MWC116ELT, MWC116ENT, MWC Series specifications

Crown Boiler's MWC Series represents a commendable choice in the realm of residential and light commercial heating solutions. Specifically, models like the MWC116ENT, MWC116ELT, MWC116ELL, and MWC116ENL stand out due to their exceptional performance, reliability, and innovative features.

At the core of the MWC Series lies a robust cast iron boiler construction designed to withstand the test of time. This material not only provides durability but also enhances heat retention, thereby increasing the system's efficiency. Each model in this series is designed for natural gas or propane fuel types, ensuring flexibility based on availability and user preference.

A notable feature of the MWC116 models is the efficient heat exchanger, which enables rapid heating of water for both space heating and domestic hot water applications. With a heating capacity of 116,000 BTUs, these boilers deliver ample warmth for mid-sized homes or light commercial settings, making them a versatile option for various applications.

The MWC116ENT model is equipped with an energy-efficient electronic ignition system, which enhances reliability and efficiency. This technology reduces energy consumption, providing users with cost savings on their utility bills. Similarly, the MWC116ELT model boasts an integrated aquastat that regulates water temperature, ensuring optimal performance and comfort.

For those requiring increased venting options, the MWC116ELL model includes advanced horizontal venting capabilities, allowing for flexible installation in various environments. This feature aids in overcoming space limitations and facilitating optimal combustion conditions. The MWC116ENL, on the other hand, features a low NOx emissions configuration, making it an environmentally conscious choice for users concerned about their carbon footprint.

User-friendly controls are a characteristic hallmark of the MWC Series, enabling straightforward operation and easy adjustments. The boilers come equipped with a digital display that provides critical system information and diagnostics, streamlining maintenance efforts.

Overall, the Crown Boiler MWC Series, particularly models like the MWC116ENT, MWC116ELT, MWC116ELL, and MWC116ENL, offer an impressive blend of efficiency, flexibility, and advanced technology. These units are designed to meet contemporary heating demands while ensuring sustainable operation, making them a wise investment for comfort and performance in residential and light commercial applications alike. With reliable construction and innovative features, the MWC Series remains a top choice for those seeking effective heating solutions.