17.Lay the guide tube (B) Fig. 20, on the saw table as shown, and line up the threaded holes (C) on bottom of guide tube (B) with the through holes (D) on the front rail
(A). IMPORTANT:If a switch adapter is being used for Unisaws or 10 Contractor s Saws to mount the switch to the rail and guide tube, holes (E) are used to mount the Unisaw switch adapter and holes (F) will be used for the Contractor s Saw switch adapter.
18.Position the guide tube (B) Figs. 21 and 22, on the front rail and fasten the guide tube to the rail using the 1/2 long hex screws (G) and lockwashers in all of the holes except the ones used to fasten the switch adapter if applicable.
19.Figure 21 illustrates the Unisaw switch adapter (H) mounted to the front rail and guide tube using two 3/4 long hex screws (J) and lockwashers.
20.Figure 22 illustrates the Contractor s Saw switch adapter (K) mounted to the front rail guide tube using two 3/4 long hex screws (J) and lockwashers.
21.NOTE: If there is not enough cord (L) Figs. 21 and 22, available to pull out and reposition the switch, simply cut the cable strap holding the cord to the inside of the saw cabinet. After switch is repositioned, make certain that the cord does not come into contact with the saw blade and use the cable clamp supplied with the fence to hold the cord in position.
22. On the Contractor s Saw, attach the switch (M) Fig. 23, to the switch adapter (K) using the 1 long hex screw (N), flat washer, lockwasher and hex nut supplied.
F
A
FE
B
E C
D
Fig. 20
H J
B J
GL G
Fig. 21
J
G
BL K
Fig. 22
N
K
M
Fig. 23