Electrical Wiring of Fan Motor and Accessories
•Installation of a vibration
•All electrical work should be performed only by qualified personnel and in accordance to prevailing electrical codes, practices and safety standards.
•The motor starter should be sized on voltage, nominal horsepower, and maximum full load current. This current value can be found on the motor nameplate. If the starter cannot accept the maximum full load motor current, the next size should be used.
•Motor heaters should be selected on the basics of maximum full load current and service factors based on the motor nameplate.
•Standard “Cooling Tower Service” motors are supplied with a minimum of a 1.15 Service Factor.
•Optional two speed motors are single winding variable torque.
•Run flexible conduit with some slack from the motor conduit box to terminal box outside the tower where rigid conduit can be used.
•Conduit holding clip screws can be tapped directly into the tower wall. Use maximum 3/8” long screws.
•For the typical wiring schematic of fan motor and tower accessories, see Delta dwg. DT
Location, Piping and Connections
•Piping should be adequately sized in accordance with accepted standard practices.
•Gravity drain to indoor storage sump requires proper head differential and piping design considerations. Allowance must be made for flow, pipe size, piping layout and distance of cooling tower from the indoor storage sump.
•On multiple cell installations, valving and/or pipe sizing should balance pressure drops to provide equal inlet pressures. Equalizing fittings are provided in the sumps of each cell and can piped together to balance sump water level. Each cell should be valved separately to allow for flow balancing or isolation from service.
•Prior to
•Check that the SS hexagonal nuts on the inlet and outlet PVC flanges are properly tightened to prevent nuisance leaks. While tightening the nuts, do not allow the bolt to rotate. This could damage the rubber seal under the flat washer on the bolt head located inside the cooling tower.
•All supply and return piping must be independently supported.