PVC Distribution System
To prevent damage to the PVC distribution system during cold weather
Piping
When the cooling tower is located outdoors, adequate measures including the use of heating tapes and insulation should be considered to protect water lines from freezing.
Operation at Sub-freezing Ambients
See Thermostatic On/Off control
1.Insure that the cooling tower is operating at the maximum possible heat load - An operating cooling tower will continuously extract heat from the circulating water. Without a heat load, the water will end up either at the air wet bulb temperature, or as ice, whichever occurs first.
2.Maintain Design Water Flow Rate Over The Fill - Reducing water flow over the fill area can produce
3.Make sure a thermostat is installed to control fan operation to off at low
4.If tower is equipped with two speed motors, operate at low speed to increase leaving water temperature.
5.Cycle fans periodically to prevent ice from forming on louvers.
6.It may also be necessary to reverse fans for a short period of time to help melt ice by forcing warm water into tower.
•
•Reverse fan(s) no more than 2 minutes at a time (repeat as necessary). Extended
reverse operation can cause ice to form on fan blades causing an
•If the tower is equipped with a
•On
•After reversal, let fan(s) stand idle 5 to 10 minutes before forward operation.
•Monitor the tower closely for unusual vibrations or sounds.
7.Frequent visual inspections and routine maintenance during