Desa 28BN installation manual Operation, Assembly, Continued, Lighting Instructions, For..com

Models: 28BN

1 12
Download 12 pages 3.1 Kb
Page 6
Image 6
OPERATION

6

ASSEMBLY OPERATION

ASSEMBLY

Continued

11.Place the cylinder inside the base with the regulator to the front of base assembly. Make sure the bottom collar of the cylinder is in front of the tab in the base (see Figure 11).

12.Verify valve on heater is in OFF position.

13.Turn cylinder supply valve fully counterclockwise to the OPEN position.

14.Use a soapy water solution to check all connections for leaks before attempting to light heater. If leak is found, turn cylinder valve to CLOSE and do not use until all leaks are corrected.

15.Turn cylinder supply valve fully clockwise to CLOSE position.

16.Plug ignitor wire back into piezo ignitor and replace control cover (see Figure 7, page 5).

17.Install knob onto gas valve stem aligning “d-flat” (see Figure 13).

18.Install shoulder screw, provided, into center hole at bottom of back plate (see Figure13).

19.Place cylinder cover over this screw while inserting tab in base (see Figure 13).

Slide Over

Shoulder Screw LIGHTING INSTRUCTIONS Cylinder

Cover

Ventilation

Shoulder

Openings

 

Screw

20 lb.

Propane/LP

Cylinder

Tab in

Base

Figure 11 - Installing Propane/LP Cylinder

Intake Air Opening

Gas Valve

Stem

Intake Air

 

Openings on

Gas Valve

Both Sides of

Knob

Cover

 

Manual background Piezo Ignitor

Figure 12 - Installing Gas Valve Knob

Tab Manual backgroundManual background

Figure 13 - Installing Cylinder Cover

OPERATION

LIGHTING INSTRUCTIONS

1.Remove cylinder cover by lifting up and out.

2.Using only a 20 lb. propane/LP cylinder, not included (see safety information for proper cylinder selection), connect the hose/regulator assembly to the cylinder (see Figure 10, page 5). The hose should already be connected to the heater. When connecting regulator assembly to cylinder valve, hand tighten nut clockwise to a positive stop. DO NOT use a wrench to tighten. Use of a wrench may damage quick closing coupling nuts and result in a hazardous condition.

3.Place the cylinder inside the base with the regulator to front of base assembly. Make sure the bottom collar of the cylinder is in front of the tab in the base (see Figure 11).

4.Turn heater valve to OFF position.

5.Turn cylinder supply valve fully counter clockwise to OPEN position.

6.Use a soapy water solution to check the connection. For leaks before attempting to light heater. If leak is found, turn cylinder valve to CLOSE and do not use until all leaks are corrected.

7.Replace cylinder cover by sliding cover over shoulder screw while inserting tab in base (see Figure 13).

8.Push knob in and turn counter clockwise to the PILOT position.

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundForManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background.Manual backgroundManual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual background

107396

Page 6
Image 6
Desa 28BN installation manual Operation, Assembly, Continued, Lighting Instructions, For..com