INSTALLATION

Continued

For Built-In Installation

WARNING: A licensed elec- trician must connect the wiring harness to electrical supply following all local codes. Electri- cian must provide a clamp on the box cover to secure the wiring. Wiring should be routed through the bushing in the hole on the outer casing of heater.

WARNING: ELECTRICAL GROUNDING INSTRUCTIONS Thisapplianceisequippedwitha three-prong (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle.

1.Install a snap bushing found in hardware kit into one of the holes found on rear of blower control shield. The other hole is for a strain relief clamp (not supplied) to secure incoming electrical supply.

2.Follow steps 2 through 6 in Installing Blower Assembly, page 12. Also remove black wire from middle/OFF switch terminal.

3.Remove black plastic strain relief and power cord from switch plate (see Figure 18). The power cord supplied will not be used in built- in installations. Pop in the plastic snap bushing found in hardware kit into the hole left by supply cord/strain relief.

4.A licensed electrician must follow the wiring diagram in Figure 19, page 15 to connect incoming electrical supply to fan kit wiring harness.

5.Test to make sure the blower is working properly.

6.Reinstall hood assembly (see page 12) and close lower louver door.

7.Place log set back into unit.

Blower Bracket

Assembly

Screw

Switch

Strain Wire

Relief Harness

Power

Cord

Blue

Switch

Plate

Red

Outlet Receptacle

Shield

Cover

Blower

Control

Shield

Clamp

Connector (not Wire

included) Harness

Figure 18 - Installing Blower Bracket Assembly

14

www.desatech.com

113896-01A

Page 14
Image 14
Desa CF26PTA installation manual For Built-In Installation