Desa (V)VC42P, CGCDV42NR, CGCDV42PR Horizontal System Installation Using TWO 90 Elbows

Models: (V)VC42P CGCDV42NR CGCDV42PR

1 44
Download 44 pages 56.15 Kb
Page 14
Image 14
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.45° Elbow 20' max.

20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

14

www.desatech.com

116236-01G

Page 14
Image 14
Desa (V)VC42P, CGCDV42NR, CGCDV42PR installation manual Horizontal System Installation Using TWO 90 Elbows