Desa CGN10 Installing To Wall, Continued, Marking Screw Locations, Mounting Screw Locations

Models: CGN10

1 28
Download 28 pages 57.17 Kb
Page 10
Image 10
INSTALLING TO WALL

10

INSTALLING TO WALL

Continued

For convenience and efficiency, install heater

where there is easy access for operation, inspection, and service

in coldest part of room

CEILING

36"

Minimum

Figure 4 - Mounting Clearances As Viewed From Front of Heater 6" Minimum

From Marking Screw LocationsFigure 5 - Mounting Screw LocationsManual background Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 4 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

Manual background WARNING

Maintain minimum clearances shown in Figure 5. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 5).

8 7/8" Manual backgroundManual background 7 3/4"Manual background

Minimum To

Maintain 6"

Clearance

From Wall

WALL

Mounting

20 1/4"

 

Screw

Minimum To

JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 5 - Mounting Screw Locations

099404

Page 10
Image 10
Desa CGN10 Installing To Wall, Continued, Marking Screw Locations, Mounting Clearances As Viewed From Front of Heater