Desa EFS33NRB, EFS33PRB, VSGF33PRB, VSGF33NRB raise the mantel to an accept- able height

Models: VSGF33PRB EFS33PRB VSGF33NRB EFS33NRB

1 36
Download 36 pages 370 b
Page 12
Image 12
•raise the mantel to an accept- able height

INSTALLATION

Continued

Mantel Clearances for Built-In

Installation

If placing mantel above built-in fireplace, you must meet minimum clearance between mantel shelf and top of fireplace opening.

NOTICE: If your installation does not meet the minimum clear- ances shown, you must do one of the following:

raise the mantel to an accept- able height

remove the mantel

NOTICE: Surface temperatures of adjacent walls and mantels become hot during operation. Walls and mantels above the firebox may become hot to the touch. If installed properly, these temperatures meet the require- ment of the national product standard. Follow all minimum clearances shown in this manual.

Note:

 

Mantel Shelf

All Vertical

 

 

 

 

 

measurements

10"

 

 

 

 

are from top of

 

 

 

 

8"

 

 

 

 

fireplace opening

 

 

 

 

6"

 

 

 

 

to bottom of

 

 

 

 

mantel shelf.

2 1/2"

 

 

 

 

 

 

 

 

Minimum Non-

 

 

 

 

 

Combustible

 

 

 

 

 

Material

13"

16"

19"

21"

 

 

 

 

 

 

 

 

 

Figure 16 - Minimum Mantel Clearances

for Built-In Installation

INSTALLING GAS PIPING TO FIREPLACE LOCATION

Manual background WARNING: This appliance requires a 1/2" NPT (National Pipe Thread) inlet connection to the pressure regulator.

Manual background WARNING: A qualified ser- vice person must connect fire- place to gas supply. Follow all local codes.

Manual backgroundCAUTION:Neverconnectpro- pane/LP fireplace directly to the propane/LPsupply.Thisfireplace requiresanexternalregulator(not supplied).Installtheexternalregu- lator between the fireplace and propane/LP supply.

Manual background WARNING: Never connect natural gas fireplace to private (non-utility) gas wells. This gas is commonly known as well- head gas.

Installation Items Needed

Before installing fireplace, make sure you have the items listed below.

external regulator for propane/LP unit only (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap (optional)

tee joint

pipe wrench

approved flexible gas line with gas connector (if allowed by local codes) (not provided)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See Accessories, pages 32 through 34.

12

www.desatech.com

113132-01A

Page 12
Image 12
Desa EFS33NRB, EFS33PRB, VSGF33PRB, VSGF33NRB installation manual raise the mantel to an accept- able height