12
FINISHING YOUR CHIMNEY SYSTEM
Flashing Installation
Storm Collar Installation
Terminations
VENTING INSTALLTION
Continued
Flashing Installation
Determine the flashing to be used with the roof opening chart, page
11.Slide flashing over pipe until base is flat against roof. Replace as many shingles as needed to cover exposed area and flashing base. Secure in position by nailing through shingles. DO NOT NAIL
THROUGH FLASHING CONE.
Storm Collar |
| |
| Chimney Pipe | |
Flashing | Overlap | |
| ||
Nail Only Outer | Shingles | |
Top and | ||
Perimeter of | ||
Sides | ||
Flashing | ||
Only | ||
|
Terminations
The fireplace system must be terminated with the listed round top or chase terminations. In any case, refer to the installation instructions supplied with the terminations.
The terminations approved for this fireplace are
CAUTION: Do not seal openings on the rooftop flashing. Follow the installation instructions pro- vided with the termination being used.
Underlap Shingles
At Bottom
Figure 26 - Flashing Installation
Storm Collar Installation
Place storm collar over pipe and slide down until snug against the open edge of the flashing (see Figures 26 and 27). Apply waterproof caulking to all seams and notches around storm collar and also at base around shingles.
Chimney Pipe
Caulk
Stainless
Inner Flue
Pipe
Secure
Termination
To Outer
Pipe With
3 Screws
Overlap Shingles
(Top and Sides)
of Flashing Base
1" Noncombustible
Spacer
Chase Top
Screen
1" Space
Apply Waterproof
Caulking
Storm Collar
Flashing
Underlap
Shingles
Storm Collar
Flashing
Figure 27 - Storm Collar
Figure 28 - Terminations