Desa VV36ENC1 SERIES Pre-Installation Preparation, Location and space requirements, Clearances

Models: VV36EPC1 SERIES (V)V36EP-B VV36ENC1 SERIES (V)V36EN-B

1 34
Download 34 pages 58.71 Kb
Page 4
Image 4
Pre-Installation

Pre-Installation

Preparation

Location and space requirements

Determine the safest and most efficient location for your DESA direct-vent fireplace. Make sure that rafters and wall studs are not in the way of the venting system. Choose a location where the heat output is not affected by drafts, air conditioning ducts, windows or doors. Figure 2 shows some common locations. Be aware of all restrictions and precautions before deciding the exact location for your fireplace and termination cap.

When deciding the location of your fireplace, follow these rules:

Do not connect this fireplace venting to a chimney flue serving a separate solid-fuel burning fireplace or appliance.

Due to high temperatures, do not locate this fireplace in high traf- fic areas, windy or drafty areas, or near furniture or draperies.

Proper clearances must be maintained.

If your fireplace is to be installed directly on carpeting, vinyl tile, or any combustible material other than wood, it must be installed on a metal or wood panel extending the full width and depth of the fireplace. See Figure 3.

Your fireplace is designed to be used in zero clearance instal- lations. Wall or framing material can be placed directly against any exterior surface on the back, sides, or top of your fireplace, except where standoff spacers are integrally attached. If standoff spacers are attached to your fireplace, these spacers can be placed directly against wall or framing material. See framing details on page 5.

If you plan on installing a television or entertainment center re- cessed above your fireplace, it is recommended that you maintain a minimum 18" above top of louver opening.

When locating termination cap, it is important to observe the minimum clearances shown in Figure 7, page 6.

If recessing into a wall, you can avoid extra framing by position- ing your fireplace against an already existing framing member.

Do not recess termination cap into a wall or siding.

You may paint the termination cap with 450º F (232º C) heat- resistant paint to coordinate with the exterior finish.

There must not be any obstruction such as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where excessive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termination area.

Flush with a wall

Corner installation

Through exterior wall enclosed in a chase

Figure 2 - Common Fireplace Locations

29"

21D1/8"

FW41"

Figure 3 - Fireplace Bottom Dimensions

Clearances

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0"/mm

Perpendicular walls

6" (15.2 cm)

Floor

0"/mm

Ceiling to louver opening

42" (106.7 cm)

Front

36" (91.4 cm)

Top

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace .

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your primary heating system. Do not install this fireplace as your pri- mary heat source. If you have a central heating system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house.

www.desatech.com

111253-01F

Page 4
Image 4
Desa VV36ENC1 SERIES, VV36EPC1 SERIES, (V)V36EN-B Pre-Installation Preparation, Location and space requirements, Clearances