Desa (V)VC36PE Series Continued, Horizontal System Installation, USING TWO 90 ELBOWS

Models: (V)VC36PE Series

1 40
Download 40 pages 9.94 Kb
Page 14
Image 14
HORIZONTAL SYSTEM INSTALLATION
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

14

www.desatech.com

116235-01F

Page 14
Image 14
Desa (V)VC36PE Series installation manual Continued, Horizontal System Installation, USING TWO 90 ELBOWS