Desa (V)VC42PE, (V)VC42NE installation manual Venting with Two 90 Elbows

Models: (V)VC42PE (V)VC42NE

1 38
Download 38 pages 10.74 Kb
Page 12
Image 12

12

VENTING INSTALLATION INSTRUCTIONS Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise re- quirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

 

 

Horizontal (H1)

Horizontal (H1) +

 

Vertical (V)

Horizontal (H2)

45° Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

 

Horizontal (H1) +

Vertical (V)

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

www.desatech.com

116237-01A

Page 12
Image 12
Desa (V)VC42PE, (V)VC42NE installation manual Venting with Two 90 Elbows