TABLE OF CONTENTS
|
| SECTION I DESIGN |
|
|
For The System Design Engineer |
| Page | ||
1. | General Description |
| 1 | |
2. | System Design and Layout | 1 | ||
3. | Outdoor Installations |
| 2 | |
|
| SECTION II INSTALLATION |
|
|
For The Installing Contractor |
|
| ||
1. | Unpack and Inspect |
| 2 | |
2. | Position Air Cleaner Cabinet | 2 | ||
3. | Connect Adjoining Ductwork | 2 | ||
4. | Connect Drain |
| 3 | |
5. Mount Controller/PWM Power Supply | 3 | |||
6. | Complete Wiring |
|
|
|
A. High Voltage Wiring | 3 | |||
B. Primary Wiring |
| 3 | ||
C. Grounding |
| 3 | ||
7. | Checkout for System | 3 | ||
|
| SECTION III OPERATION AND SERVICE |
|
|
For The Maintenance Engineer |
|
| ||
1. | Introduction and Principle of Operation | 4 | ||
2. | General Description |
| 4 | |
3. | Initial |
| 4 | |
4. | Routine Maintenance |
| 5 | |
5. | Periodic Maintenance | ................................................................................................................ | 5 | |
6. | Trouble Shooting |
| 6 | |
7. | Spare Parts |
| 7 | |
8. | Troubleshooting Reference Chart | 8 | ||
9. | Page 9 through 11 | NOT USED | ||
|
| SECTION IV REFERENCE |
|
|
Illustrations and Drawings |
|
|
| |
Figure 1 | General Component Arrangement | 12 | ||
Figure 2 | High Voltage Lead Terminal Connections | 13 | ||
Figure 3 | Typical Outdoor Installation | 14 | ||
Figure 4 | Model 75 Junction Box… | 15 | ||
Figure 5 | Unit Outline | 16 | ||
Figure 6 | ATS Control Outline (STANDARD) | I7 | ||
Figure 7 | ATS PWM Remote Box (OPTIONAL) | 18 | ||
Figure 8 | AIR BOSS CONTROL (OPTIONAL) | 19 | ||
Figure 9 | Not Used | 20 | ||
Figure 10 | Not Used | 21 | ||
Figure 11 | ATS Control (Standard)– Schematic | 22 | ||
Figure 12 | ATS Control (Standard)– Field Wiring/ Sequence of Operations | ..... 23 | ||
Figure 13 | ATS Remote (optional)– Schematic | 24 | ||
Figure 14 | ATS Remote (optional)– Field Wiring | 25 | ||
Figure 15 | Air Boss Control (optional) – Schematic | 26 | ||
Figure 16 | Air Boss Control (optional) – Schematic/Field Wiring | 27 | ||
Figure 17 | Air Boss Control (optional)– Sequence of Operations | 28 |