G e n e r a l P r e - O p e r a t i o n I n s t r u c t i o n s

Priming Pump For Electric Packs

The Power pack system is located under the wood skirt. The equipment can be serviced by simply opening the doors.

It is important to make sure that all of the air is out of the equipment pack before operating. To do this follow procedures below:

Turn off power at the breaker

Make sure the gate valves are open

Fill the spa with water going thru the filter

Turn the power on at the breaker

Start the pump on Hi-Speed and water will start circulating within

one to two minutes. (The pump is self-priming). If water does not circulate, turn off the power and make sure all gate valves are open if so equipped.

Restart the pump. Within one to two minutes, it should be primed

Air Blower

Ozonator

Equipment Pack

(Optional)

 

 

Auxiliary Pump

Flow Thru

 

2 Speed

(Optional)

Heater

Gate Valves

High Performance

Circulation

Pump

 

Pump

 

(Optional)

 

Set thermostat, located on top side control panel to desired temperature, and continue heating until desired temperature has been reached. Depending on equipment, this will normally take 8 to 10 hours.

WARNING: Do not run spa with gate valves closed or run pump with no water circulating in spa for long periods. This could damage the spa equipment.

Page 11
Image 11
Dynasty Spas D-1000, D-2000, D-3000 owner manual N e r a l P r e O p e r a t i o n I n s t r u c t i o n s