Eaton Electrical IT-RSS, XT-40, IM01005012E instruction manual Power Up and System Checkout

Models: IT-RSS IM01005012E XT-40

1 12
Download 12 pages 46.63 Kb
Page 10
Image 10
2.8Power Up and System Checkout

IM01005012E

XT-40 & IT-RSS Installation

 

 

2.8Power Up and System Checkout

Apply system power and observe that the LED(s) on the front of the SPD should glow. One LED should glow for each Phase voltage being monitored.

Should there be a significant difference in brightness, check the phase rotation of the panel and ensure that the SPD’s Phase wires are connected to the correct phase. Slight differences in brightness DO NOT indicate a faulty device, rather specification tolerance differences of the indicator circuit’s components. LED brightness symmetry and/or level do not indicate the SPD’s operational status.

Page 8

Rev. 1 – 2/2007

Page 10
Image 10
Eaton Electrical IT-RSS, XT-40, IM01005012E instruction manual Power Up and System Checkout