Manuals
/
EAW
/
Home Audio
/
Speaker
EAW
owner manual EAW Part RD0169, Including KF730P & SB730P
Models:
SB730
KF730
1
1
28
28
Download
28 pages
17.38 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Specs
5.3SYSTEM BLOCK DIAGRAM
Maintenance
5.8.6Wire Gauge
6.4.2Basic Attachment Procedure
4.4.5Signal Delay on Subwoofers
5.4.1Factory Signal Processing Settings
6.7.7Setting the Tilt Angle for the Entire Array
1.2SAFETY PRECAUTIONS
Page 1
Image 1
KF730 & SB730 LOUDSPEAKER
OWNER’S MANUAL
Including KF730P & SB730P
EAW Part: RD0169
Page 2
Page 1
Image 1
Page 2
Contents
Including KF730P & SB730P
EAW Part RD0169
Page
TABLE OF CONTENTS
1.3GENERAL PRECAUTIONS
1.2SAFETY PRECAUTIONS
1.READ THIS FIRST
1.1EC STATEMENT OF CONFORMITY
2.INTRODUCTION
3.1CONTENTS
3.UNPACKING
2.1KF730 AND SB730
4.1KF730 WIZARD
4.KF730 ARRAY DESIGN
4.2FILL COVERAGE
4.1.1Computer Requirements
4.4SUBWOOFERS
4.3GROUND STACKING
4.2.4KF730 Series as Side-fillArrays
4.4.1General Considerations
4.4.4Other Subwoofers
4.4.5Signal Delay on Subwoofers
Model
Subwoofer
5.4SIGNAL PROCESSING
5.3SYSTEM BLOCK DIAGRAM
5.ARRAY OPERATION
5.1OVERVIEW
5.6USER ADJUSTMENTS
5.5AMPLIFIER GAIN SETTINGS
5.7AMPLIFIER POWER REQUIREMENTS
5.4.1Factory Signal Processing Settings
KF730 Qty
5.7.2Selecting an Appropriate Amplifier Size
SB730 Qty
SB730 Qty
5.7.4Operating Limits
5.8INPUT CONNECTIONS
5.8.1KF730 Input Connections
5.8.3SB730 System Input Connections
5.8.2SB730 Connections
5.8.4KF730P Input Connections
5.8.6Wire Gauge
+ --+
5.8.5SB730P Input Connections
6.1RIGGING WARNINGS
6.RIGGING
6.3FLY-BARRIGGING RECOMMENDATIONS
6.4.2Basic Attachment Procedure
6.4ATTACHING ENCLOSURES TO THE FLY-BAR
For a given quantity of SB730
6.4.4Hinge and Hinge Tube Holes
6.4.3Quick Release Pins
KF730 to Fly-Bar
KF730 to KF730
6.4.5Locking Pins
6.6INITIAL RIGGING PREPARATION
6.5PALLETS
6.5.1KF730 Face Pallet
6.5.2SB730 Pallet
6.7.1KF730s On KF730 Pallet
6.7SUSPENSION PROCEDURES
6.7.2SB730s on SB730 Pallet
6.7.3Attaching a KF730 or SB730 to the Fly-Bar
6.7.6Attaching KF730s to KF730s Already Suspended
6.7.4Attaching SB730s to SB730s Already Suspended
6.7.7Setting the Tilt Angle for the Entire Array
6.8GROUND STACKING PROCEDURES
6.8.1Stacking With SB730s as the Base
6.8.3Stacking With the Fly-Baras the Base
7.Repeat steps 1 to 6 for additional enclosures
7.3LITERATURE AND SPECIFICATIONS
7.2SERVICE INFORMATION
7.CONTACTING EAW
7.1OPERATING QUESTIONS
8.1GENERAL SERVICE
8.SERVICE AND MAINTENANCE
8.2RIGGING SERVICE
8.3BASIC FIELD TROUBLESHOOTING
8.4.7Connecting Pins
8.5MAINTENANCE
8.5.1Performance Testing
8.5.2Cleaning
2004 Mar RD0169