Select and start a washing programme

Select the washing programme and delay start with the door slightly opened. The start of the programme or the countdown of

the delay start will occur only after the closure of the door. Until then it is possible to modify the settings.

1.Check that the baskets have been loaded correctly and that the spray arms are free to rotate

2.Check that the water tap is opened

3.Press the On/Off button. The dishwasher must be in setting mode.

4.Press the button corresponding to the required programme (see "Washing programmes" chart).

Close the dishwasher door, the programme starts automatically.

Setting and starting the programme with "delay start"

1.After having selected the washing programme, press the delay start button until the number of hours for the delay start will appear in the digital display. The commencement of the selected washing programme can be delayed from 1 to 19 hours.

2.Close the dishwasher door, the countdown starts automatically.

3.The countdown will decrease with steps of 1 hour.

daily use electrolux 25

4.The opening of the door will interrupt the countdown. Close the door; the countdown will continue from the point at which it was interrupted.

5.Once the delay start has elapsed the programme will start automatically.

Interrupt or cancel a washing programme in progress ONLY if it’s absolutely necessary.

Attention! Hot steam may escape when the door is opened. Open the door carefully.

Interrupt a washing programme in progress:

Open the dishwasher door; the programme will stop. Close the door; the programme will start from the point at which it was interrupted.

Cancel a washing programme in progress

Simultaneously press and hold the two programme buttons positioned

over the word Cancel , until all the programme button lights illuminate. The washing programme has been cancelled.

If a new washing programme is to be selected, check that there is detergent in the detergent dispenser.

Page 25
Image 25
Electrolux ESL 46010 user manual Interrupt a washing programme in progress