INDEX
| pag. |
INTRODUCTION | 1 |
UNPACKING | 2 |
TECHNICAL SPECIFICATION | 3 |
MACHINE CONTROLS | 4 |
PREPARATION FOR USE | |
SCRUBBING AND DRYING OPERATION | |
CHANGING BRUSHES | |
MAINTENANCE | |
SAFETY AND FAULTS | 20 |
TROUBLE SHOOTING | 21 |
OPTIONALS |
NOTE
| pag. |
INTRODUCTION | 1 |
UNPACKING | 2 |
TECHNICAL SPECIFICATION | 3 |
MACHINE CONTROLS | 4 |
PREPARATION FOR USE | |
SCRUBBING AND DRYING OPERATION | |
CHANGING BRUSHES | |
MAINTENANCE | |
SAFETY AND FAULTS | 20 |
TROUBLE SHOOTING | 21 |
OPTIONALS |
NOTE