B.5 in 1 FUNCTION BRACKETS on RACK-MOUNT 3U DESIGN:

(1)19” Rack installation:

Mount the 3U rack-mount in a 19-inch EIA 310 C standard rack.

19” rack width

(2)23” Rack installation:

Change the position of the two mounting brackets to mount the 3U rack-mount in a 23-inch EIA 310 C standard rack.

23” rack width

(3)Tower installation:

a.Move the mounting brackets from the front to the side and attach the brackets by screws. Then let the UPS stand with the vertical direction as the below pictures shown.

b.Rotate the control panel unit from horizontal to vertical direction.