INSTALLATION (continued)
observe these lights
Automatic Closed Transition
Transfer Switch
|
| Transfer |
|
|
| |
Transfer Switch | Transfer Switch | Control |
|
|
| |
Connected | Connected | Retransfer | Transfer | Extended | Failure | TS |
To | To | Delay | Test | Parallel | To | Locked |
Normal | Emergency | Bypass | (15HOLDSECONDSFOR ) | Time | Synchronize | Out |
GREEN | RED |
|
| RED | RED | RED |
Normal | Emergency | operate |
| Closed |
this switch |
| |||
Source | Source | Alarm | Transition | |
Accepted | Accepted |
| Reset | Bypass |
GREEN | RED |
|
|
|
Figure 1-7. Standard controls and indicators.
3 --- Electrical Operation
This procedure will check the electrical operation of the Automatic
!
Close the enclosure door first.
Transfer Test
Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 5 at the right. Observe the status lights.
■Black square means light is on.
❐White square means light is off.
**If you do not want
Closed Transition Bypass pushbutton while the controller display shows Waiting for
This completes the Functional Test of the ACTS.
The Transfer Switch Connected
1To Normal and Normal Source Accepted lights should be on.
Turn and hold Transfer Control switch clockwise to Transfer Test
2until the engine starts and runs (within 15 sec.). Emergency Source Accepted light should come on.
Transfer switch CE closes and then Transfer Switch CN opens
3Emergency light should come on and the Transfer Switch Connected to Normal light goes off (you might see and hear the brief overlap transfer). **
Transfer switch will operate back to Normal position after Feature 3A time delay. For immediate retransfer turn Transfer Control
4counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected To Normal light should come on; Transfer Switch Connected to Emergency light should go off.
The