Emerson Top of Liebert XDR and Equipment Rack, Rear of Equipment Rack, 6.6.2Header System

Models: XDR

1 40
Download 40 pages 56.62 Kb
Page 23
Image 23
Top of

Piping

Figure 15 Hard pipe connection diagram

Return Main (seen from end )

2-1/8" O.D. Rear of or 2-5/8" O.D. 6.6.1Leak-Checking and Evacuation

Acceptable 6.6.2Header System Arc

7/8” Refrigerant -Grade

Full-Port Ball Valve

Field-Supplied and

Field-Installed

Recommended Arc

Manual background Supply Main

(seen from end ) 1-1/8" O.D.

or 1-3/8" O.D.

1/2” Refrigerant -Grade

Full-Port Ball Valve

Field-Supplied and

Field- Installed

Refer to Table 1 for details.

Copper Tubing

Total length of each line from Liebert XDR to Main not to exceed 72" (1829 mm)

Return from Manual background

Cooling Module

Top of

Liebert XDR

and

Equipment

Rack

Manual background Supply

to Cooling

Module

Rear of

Equipment Rack

6.6.1Leak-Checking and Evacuation

Refer to the Liebert XDC or Liebert XDP user manual for procedures for evacuation, leak check, charging and startup.

6.6.2Header System

The Liebert XDR module system with optional flexible piping requires use of the Liebert XD prefabri- cated piping assembly. The prefabricated piping is compatible with the Liebert XD Flex Pipe required to attach to the Liebert XDR modules. For the details on piping connection locations, see Figure 14.

For additional information, refer to the Liebert X-treme Density System Design Manual, SL-16655, available at the Liebert Web site: www.liebert.com

17

Page 23
Image 23
Emerson user manual Top of Liebert XDR and Equipment Rack, Rear of Equipment Rack, 6.6.1Leak-Checkingand Evacuation