CLEARANCES (continued)

Sidewall & Ceiling Clearances (Figure 3)

18”, 24”, 30” Log 41”

6”

Figure 3

The sides of the fireplace opening must be 6" from any combustible wall. The ceiling must be at least 41" (for 18", 24" and 30" logs) from the fireplace opening.

Mantel Clearances Without Hood (Figure 4)

You must have non-combustible materials above the fireplace opening. Non-combustible material must extend at least 12" above fireplace opening. With sheet metal, you must have non- combustible material behind it.

Heat resistant materials such as slate and marble must be at least 1/2" thick. Sheet metal should not be installed onto combustible material.

10” and less Mantel

HEAT RESISTANT

28”

 

MATERIAL

 

12” WITHOUT

 

HOOD

12”

 

HEATER IN FIREPLACE

OR FIREBOX

Figure 4

If your installation does not meet the above clearances, you must proceed to one of the following steps:

Use a hood.

Operate the heater with flue damper open. See page 11 for Install- ing as a Vented Appliance.

Raise the mantel to the proper height.

Remove the mantel.

23099-1-0707

Non-Combustible

Requirements for Safe Installation

Material Distance

 

12" or more

Non-combustible material

Less than 12"

Non-combustible material must be extended

 

to at least 8" with the installation of the

 

optional fireplace hood. If you cannot extend

 

non-combustible material at least 8", you must

 

operate heater with flue damper open.

Mantel Clearances with Hood (Figure 5)

You must have non-combustible materials above the fireplace opening. Non-combustible material must extend at least 8" above fireplace opening. With sheet metal, you must have non-combustible material behind it.

Heat resistant materials such as slate and marble must be at least 1/2" thick. Sheet metal should not be installed onto combustible material.

Example: A mantel may project from the wall a maximum of 2" at a minimum of 13-1/2" above the opening, and a maximum of 6" at a minimum of 15" above the opening.

8” Mantel

6” Mantel

4” Mantel

2” Mantel

HEAT RESISTANT

 

MATERIAL

 

8” WITH HOOD

16.0”

14.25”

13.5”

15.0”

HOOD

HEATER IN

FIREPLACE

OR FIREBOX

Figure 5

If your installation does not meet the above minimum clearances, you must proceed to one of the following steps:

Operate the heater with the flue damper open. See page 11 for

Installing as a Vented Appliance.

Raise the mantel to the proper height.

Remove the mantel.

Floor Clearance (Figure 6)

If installing heater at floor level, the minimum distance to com- bustibles is “0” inches.

Figure 6

Page 9

Page 9
Image 9
Empire Comfort Systems VFDR18LBN-1 Sidewall & Ceiling Clearances Figure, Mantel Clearances Without Hood Figure