Empire Products GWT-35-2, RB), GWT-25-2 Finishing Instructions, Figure Figure, Plastering Figure

Models: GWT-35-2 RB) GWT-25-2

1 20
Download 20 pages 8.12 Kb
Page 9
Image 9
Figure 2

62 1/4FINISHING INSTRUCTIONS

(1581 mm) Plastering (Figure 4)

14 ½”

66 1/8”

(368 mm)

(1679mm)

 

WALL

 

OPENING

Figure 2

Figure 3

FINISHING INSTRUCTIONS

Plastering (Figure 4)

In new construction use only plain (not perforated) gypsum lath around furnace and vent pipe so that plaster "Keys" will not project into wall space.

Use wood strips nailed to inside of studs and top of bottom plate. These must be removed before installation of furnace. Lath and plaster against top projection of Header Plate.

Do not allow wall finish materials to project into furnace recess.

Installing Furnace (Figure 5)

Clear the recess of all debris, and remove any wood plaster-grounds. Stand the furnace on floor in front of wall opening.

Insert furnace flue into rectangular opening in header plate and raise furnace carefully (see Figure 5). Swing bottom of furnace into wall opening with back of legs flush with rear of floor plate. Secure furnace support legs to the floor plate.

14Installing Furnace (Figure 5)½”

(368 mm)Manual background

661/8”

(1679mm)Manual background

WALL

OPENING

Figure 4

Figure 5

12425-7-0406

Page 9

Page 9
Image 9
Empire Products GWT-35-2, RB), GWT-25-2 Finishing Instructions, Figure Figure, Plastering Figure, Installing Furnace Figure