Manuals
/
Energy Tech Laboratories
/
Household Appliance
/
Fan
Energy Tech Laboratories
Modular Direct Fired Heaters manual Flame Safety Service Guide continued
Models:
Modular Direct Fired Heaters
1
25
28
28
Download
28 pages
34.52 Kb
21
22
23
24
25
26
27
28
<
>
Troubleshooting
Install
Maximum RPM and HP Chart
Warranty
Maintenance
Copper Wire Ampacity
Problem
Assembly
Start Up Procedure
Flame Safety Controller DC Flame Signal
Page 25
Image 25
Flame Safety Service Guide (continued)
(Airflow LED may or may not be illuminated)
25
Page 24
Page 26
Page 25
Image 25
Page 24
Page 26
Contents
RECEIVING AND INSPECTION
FOR YOUR SAFETY
Installation, Operation, and Maintenance Manual
FOR YOUR SAFETY
TABLE OF CONTENTS
WARRANTY
Assembly
INSTALLATION
Mechanical
Site Preparation
Installation with Exhaust Fan
Roof Mount Installation
Recommended Supply Ductwork Sizes
Indoor INLINE Installation
Direct Fired Module Installation
Heat Module Add-OnInstallation
Gas Pressure Table
Gas Connection Sizes
Electrical
Copper Wire Ampacity
Motorized Intake Damper
Fan to Building Wiring Connection
Remote Control Panel
Pilot Adjustment
Start Up Procedure
Pilot Assembly
OPERATION
Main Burner Adjustment
Heater Start Up Summary
Maximum RPM and HP Chart
Final Start Up Procedure
Pulley Adjustment Illustration
Pulley Adjustment
10 - 20 IN. BLOWER
Pulley Combination Chart
2HP Motors on 20 IN Blowers use 2VP42 Pulleys
Flame Safety Controller DC Flame Signal
Flame Safety Control
Air Flow Switch
Sequence of Operation
Modulating Gas System
High Temperature Limit
Maxitrol Amplifier
Operation Summary
Optional Remote Panel Circuit
Components
Remote Panel Option
Airflow Troubleshooting Chart
Troubleshooting
Problem
Potential Cause
Proper Spark Gap
Burner Troubleshooting Chart
Problem
Potential Cause
Light Indication
Remote Panel Troubleshooting Chart
Condition
Possible Cause
Nothing Happens
Troubleshooting Flowcharts
Airflow LED may or may not be illuminated
Flame Safety Service Guide
Airflow LED may or may not be illuminated
Flame Safety Service Guide continued
General Maintenance
MAINTENANCE
2 weeks after startup
Filter Quantity Chart
Every 3 months
Yearly
Maintenance Record
Start-Upand Maintenance Documentation
Factory Service Department
Job Information