Enviro Ascot owner manual Initial Installation, Qualified Installers Only, Continue to add pipe

Models: Ascot

1 40
Download 40 pages 32.25 Kb
Page 23
Image 23
8.Continue to add pipe

Initial Installation

QUALIFIED INSTALLERS ONLY

elbow strap down to the roof level, as shown in Figure 30. Tighten the clamp around the pipe section. Use a level to make sure the pipe is truly vertical. With roofing nails, secure the support straps to the roof. Seal the nails holes heads with non-hardening mastic. Trim the excess length of the support straps that extend out beyond the edge of the flashing.

7.Slip the flashing over the pipe section protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Use a non-hardening sealant between the uphill edge of the flashing and the roof. Insure the roofing material overlaps the top edge of the flashing as shown in Figure 30. Verify that you have at least the minimum clearance to combustibles at the roof line.

8.Continue to add pipe

 

Vertical

sections until the height

 

Termination

of the

vent

cap

meets

Elbow Strap

Storm Collar

the

minimum

code

requirements.

Refer

to

 

Flashing

Figure 31 and Table 5.

 

Note that for steep roof

 

 

pitches, the vent height

 

Roofing nails

must be increased.

In

 

 

high

wind

conditions,

 

 

nearby trees,

adjoining

 

 

roof lines, steep pitched

 

 

roofs,

and other

similar

 

 

factors

can

 

result

in

 

 

poor

draft,

 

or

down

 

 

drafting. In these cases,

 

 

increasing

the

vent

 

 

height

may

 

solve

the

Figure 30: Vertical Vent Termination Installation.

problem.

 

 

 

 

 

 

 

 

 

 

9. Slip the storm collar over the pipe, and push it down

Table 5: Minimum ‘H’ for Figure 31.

to the top of the roof flashing as shown in Figure

 

 

 

Roof Pitch

Minimum Height

30. Use the non-hardening sealant around the joint

 

 

 

between the pipe and the storm collar.

 

Feet

Meters

 

 

 

 

10. Twist-lock the vent cap.

Flat to 7/8

1

0.3

 

 

 

 

 

 

 

Over 7/12 to 8/12

1.5

0.46

 

 

 

 

 

 

 

 

 

Over 8/12 to 9/12

2

0.61

 

 

 

 

 

 

 

Over 9/12 to 10/12

2.5

0.76

 

 

 

 

 

 

 

Over 10/12 to 11/12

3.25

0.99

 

 

 

 

 

 

 

Over 11/12 to 12/12

4

1.22

 

 

 

 

 

 

 

Over 12/12 to 14/12

5

1.52

 

 

 

 

 

 

 

Over 14/12 to 16/12

6

1.83

 

 

 

 

 

 

 

Over 16/12 to 18/12

7

2.13

 

 

 

 

 

 

 

Over 18/12 to 20/12

7.5

2.29

 

 

 

 

 

Figure 31: Height of Vertical Termination;

Over 20/12 to 21/12

8

2.44

Reference Table 5.

 

 

 

 

 

 

23

Page 23
Image 23
Enviro Ascot owner manual Initial Installation, Qualified Installers Only, Continue to add pipe