Enviro C-11023 owner manual Through Wall Installation with Exterior Blower Kit

Models: C-11023

1 36
Download 36 pages 21.74 Kb
Page 23
Image 23
Figure 23: Through Wall Installation with Exterior Blower Kit.

Installation

TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION:

Wall Strap EF 5

 

90° Elbow

 

45°Elbow with Rodent

 

screen or stainless

 

steel termination hood

 

2ft Riser

 

Pipe Adaptor

Electrical Cable

Exterior Blower

 

and Housing

Figure 23: Through Wall Installation with Exterior Blower Kit.

NOTE:

Ensure that all vent connections are installed by placing a small bead of high temperature silicone at each chimney connection.

Also ensure that all vertical vent sections are properly supported and that all clearances to combustibles are maintained in accordance with the vent manufacturer’s specifications.

Wall Strap

To supply power to the exhaust

Figure 24: Through Wall Installation with Exterior Blower Kit; Side View.

Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble plate and attach to the pre drilled hole in the left hand rear hopper pillar. Hook up to wires from the exhaust blower wiring harness.

All electrical connections must be in accordance to local code requirements

23

Page 23
Image 23
Enviro C-11023 Through Wall Installation with Exterior Blower Kit, Wall Strap To supply power to the exhaust