EXCELL PRECISION CO., LTD.

<Chapter 4>

Installation

 

4-1 Load Cell

 

 

 

 

5

4

3

2

1

 

9

8

7

6

 

 

 

 

 

 

Load cell cable

Load cell

 

 

 

 

 

 

 

 

 

 

EXC+

 

 

 

 

 

SEN+

 

 

 

 

SIG+

SIG-

 

 

 

 

 

EXC-

 

 

 

 

 

SEN-

 

 

 

 

Shield

 

4-wired (5-wired) Load Cell

6-wired (7-wired) Load Cell

Short Pin4&5 to connect with EXC+

Pin5 connects with EXC+

Short Pin2&3 to connect with EXC-

Pin4 connects with SEN+

Pin1 connects with SIG+

Pin3 connects with EXC-

Pin9 connects with SIG-

Pin2 connects with SEN-

Pin6, 7, 8 connect with Shield

Pin1 connects with SIG+

 

Pin9 connects with SIG-

 

Pin6, 7, 8 connect with Shield

FM User Manual

9

SME300000119

Page 10
Image 10
Excell Precision FM user manual Chapter Installation, Wired 5-wired Load Cell