Installation and Operation, cont’d
6" Deep Rack Shelf | 1/2 Rack Width Front False |
| Faceplate |
Front false faceplate uses 2 screws.
(2)
Use 2 mounting holes on opposite corners.
Mounting an MDA EQ on a 6-inch rack shelf
2Attach the mounting brackets to the MDA EQ with the provided machine screws as shown in the previous figure.
3. | Hold the unit with the attached brackets against the |
| underside of the table or other furniture. On the mounting |
| surface, mark the location of the bracket’s screw holes. |
4. | Drill 3/32" (2 mm) diameter pilot holes, ¼" (6.3 mm) deep |
| in the mounting surface at the marked screw locations. |
5. | Insert #8 wood screws into the four pilot holes. Tighten |
| each screw into the mounting surface until slightly less |
| than ¼" of the screw head protrudes. |
6. | Align the mounting screws with the slots in the brackets |
| and place the unit against the surface, with the screws |
| through the bracket slots. |
7. | Slide the unit slightly forward or back, then tighten all four |
| screws to secure it in place. |
Projector mounting
To
Furniture mounting
To
Projector
Mounting
Bracket
Ceiling
Projector
Mounting Bolt
Preparing the MDA EQ for under-desk mounting
1. | If rubber feet were previously attached to the bottom of the |
| unit, remove them. |
Projector-mounting an MDA EQ
1. | If rubber feet were previously installed on the bottom of |
| the unit, remove them. |
2. | Attach the mounting brackets to the MDA EQ with the |
| provided machine screws. |
VersaTools® MDA EQ Series • Installation and Operation | VersaTools® MDA EQ Series • Installation and Operation |