Installation and Operation, cont’d

3.

Hold the interface with attached brackets against the

 

underside of the desk/table. With a soft pencil mark the

 

location of holes for screws on the desk based on the

 

following:

For the RGB 190 and RGB 192, mark the opening approximately 1.0" x 5.7" ( 2.5 cm x 14.5 cm).

For the RGB 198, mark the opening approximately 1.75" x 13.0" (4.5 cm x 33.0 cm).

IODUA

PMOC

RETU

 

 

GR

NOM

 

 

ROTI

 

1B

 

 

 

29

 

-H

 

2

1

LEVELS

IHS

 

4 3

NO

STF

 

6 5

 

GORRE

 

OI.DNUOAM.PMOSNDD

 

 

 

 

Figure 2-2Through-desk mounting

4.

Cut out the material from the installation area with a

 

jigsaw. Check the opening size by inserting the interface

 

part way through the hole. If needed, use a saw, file or

 

sandpaper to enlarge the hole. Smooth the edges of the

 

hole with sandpaper.

5.

Drill pilot holes 1/4" (6.4 mm) deep, and 3/32" (2 mm)

 

diameter in the underside or inside (concealed side) of the

 

furniture where the interface will be located.

6.

Secure the interface to the desk with the provided wood

 

screws.

7.

To adjust the height of the interface within the desk, slide

 

the interface up or down to the desired position, then

 

tighten the screws that attach the brackets to the interface.

Rack mounting (RGB 198 only)

1.

Remove rubber feet if they were previously installed on

 

the bottom of the interface.

2.

Mount the interface on either side of an 19" 1U Universal

 

Rack Shelf (part # 60-190-01) using two 4-40 x 3/16"

 

screws to secure it to the shelf. See figure 2-3.

3.Install blank panel(s) or other unit(s) on the rack shelf.

4.Attach the rack shelf to the rack using the supplied bolts.

6" Deep Rack Shelf

1/4 Rack Width Front False

 

Faceplate

Front false faceplate uses 2 screws.

RGB

198

Use 2 mounting holes.

(2) 4-40 x 3/16" Screws

Figure 2-3 — Rack mounting

Connections and Switches

Figures 2-4 and 2-5 show the front and rear panel of the

RGB 192 and the RGB 198, respectively. With the exception of audio features (numbers 2 and 9 ), all numbers for figure 2-4 pertain to both the RGB 190 and 192 models.

1Power indicator

Amber — Indicates power is applied.

Green — Indicates that power is applied and a sync signal is present on the input.

1

2

3

4

5

 

 

6

 

 

 

 

 

C O M P U T E R

 

H - S H I F T

S E R R

 

 

 

 

D D S P

 

AUDIO

 

S O G

 

 

 

 

N O M O N .

 

 

 

L E V E L

 

 

 

 

M . AU D I O

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

1

2

3

4

5

6

 

 

I N P U T

M O N I T O R

R G B 1 9 2

 

 

 

 

 

POWER

 

 

 

 

 

 

 

AUDIO

12-15V

 

 

 

 

 

 

 

1A MAX.

 

 

 

 

 

 

 

 

 

 

L/MONO

R

7

8

9

Figure 2-4 — RGB 192 front and rear panel features

2-4

RGB 190F, RGB 192, and RGB 198 • Installation and Operation

RGB 190F, RGB 192, and RGB 198 • Installation and Operation

2-5

Page 8
Image 8
Extron electronic RGB 192S Installation and Operation, cont’d, Connections and Switches, Rack mounting RGB 198 only