Extron electronic manual Strain Relief Tie Off Point, SF 26X User Guide Installation

Models: SF 26X

1 17
Download 17 pages 57.74 Kb
Page 13
Image 13
Figure 3. Strain Relief Tie Off Point

7.Insert the captive screw connector into the four-pole receptacle on the speaker crossover board as shown below.

Strain Relief

Tie off Point

Zip Tie

Captive Screw

 

Connector

Figure 3. Strain Relief Tie Off Point

8.Secure the speaker wire to the strain relief tie off point using the included zip tie as shown above.

9.Mount the SF 26X.

a.Insert the SF 26X through the bottom of the hole in the ceiling tile that was cut in step 2.

b.Tighten the four screws (clockwise) of the locking arms until the arms are fully engaged and the speaker is securely clamped to the ceiling, as shown below.

ATTENTION: Do not overtighten the screws.

Speaker Grille

Locking Arm

Figure 4. Mounting the Speaker Using the Four Locking Arms

 

SF 26X User Guide • Installation

9

Page 13
Image 13
Extron electronic manual Strain Relief Tie Off Point, SF 26X User Guide Installation