INSTALLATION
WINDOW INSTALLATON
Before you start:
Window Requirements:
This air conditioner is factory prepared for installation in standard double- hung windows with actual opening width of 26 7/8” to 41 5/8” and clear, vertical opening of 15 5/8” minimum from bottom of sash to sill. Unit can be installed in 23 7/8” wide window, if cabinet side seals are removed.
| A |
| B |
A 23 7/8” to 41 5/8” | B 15 5/8” minimum |
Tools Needed
Screwdrivers Ratchet or Driver with 1/4” socket
Carpenter’s Level | Tape Measure |
|
Fastener Identification | A | B | ||
Installation Parts Kit contents: |
|
|
| |
Item | Description | Qty |
|
|
A | 1” wood screw | 1 |
|
|
B | 5/8” wood screw | 5 |
|
|
Actual size
Window Installation
Decorative Front Removal
1.Remove the 3/8” phillips screws on either side of the cabinet.
2.Gently pull forward while grasping both sides of the decorative front.
Removing the Chassis
1.Remove the two (2) shipping screws from the rear bottom side of the cabinet. These shipping screws may be discarded.
2.Remove the two (2)
3.Slide the chassis out of the cabinet by grasping the base pan handle and pulling forward while bracing the top bar.
Filler Panel Frame Installation
1.Slide the filler panel frame onto the air conditioner cabinet using the tracks on the top bar and bottom bar of the unit. Slide the frame as close to the air conditioner as possible so that the curtain locks into place.
2.Gently pull the frame out until it is the correct length for your application.
Use caution when working around exposed sharp edges of the cabinet and sharp coils to avoid injury or torn clothing.
C
C
A B
A Cabinet | C 3/8” Phillips screw |
BDecorative front
A |
|
|
B |
|
|
C | D |
|
| E | |
|
| |
A Shipping screws | D Chassis | |
B Cabinet | E Base pan handle | |
C |
|
|
| A |
|
B |
|
|
| C |
|
| D | E |
A | Top Bar | D Bottom bar |
B | Filler panel frame | E Cabinet |
CFiller panel locking edge
3