combustible floor installation
Continued
Materials included:
•8 - ⅜" Rebar x 12" Long
•4 - ⅜” Rebar x 6” Long
•4 - ⅜” Bolts x 2½” Long
•28 - Washer
•28 - Nuts
•4 - Floor Joist Brackets
•2 - Ember Protector Strips
•1 - Insulation Blanket
A layer of 1" thick Insulation Blanket (Included) is required on the top and
1/2" Thick Cement
Board Dimensions
Model A1 A2
MM33 37" 28"
MM39 43" 28"
MM44 48" 28"
MM49 53" 28"
Place 1/2" cement board on top rails of platform (Not Included).
Place 1” Insulation | A1 | |
Blanket on top of |
| |
cross members | A2 | |
(Included). | ||
|
Ember Protector Strips 26 ga. Sheet Metal
Ten (10)
Anchor Bracket
Figure 32 - MMB63 Metal Base Assembly
6" Metal Base (MMB33,MMB39, MMB44, and MMB49)
The Metal Base ensures the minimum 6" clearance above combustible flooring is maintained.
Grand Meridian | Use Metal Base |
Model | Model |
MM33 | MMB33 |
MM39 | MMB39 |
MM44 | MMB44 |
MM49 | MMB49 |
Note: The insulation (concrete) board chosen must meet a thermal conductivity rating ≥ 0.4
Place Cement Board on top rails of platform (Not Included).
Place Insulation Blanket | A1 | |
on top of | A2 | |
(Included). | ||
|
Ember Protector Strips 26 ga. Sheet Metal
Eight (8)
Anchor Bracket
Figure 33 - MMB33, MMB39, MMB44 and MMB49
Metal Base Assembly
www.fmiproducts.com | 21 |