Foster F60, F85, F20, F40 manual how the installation is made, location, start up, english

Models: F60 F40 F20 F85

1 8
Download 8 pages 9.84 Kb
Page 3
Image 3
location

location

A minimum clearance of 15cm (6 in) must be left at the sides of the machine for routing cooling air drawn into and exhausted out of the compartment to maintain a proper condensing operation.

Position the ice maker in its final location and make sure that there is everything for its installation, namely:

19

Fused switched power supply.

 

 

 

 

GB

english

 

26

 

33

 

 

 

 

 

 

 

The electrical isolator switch

 

Water drain is connected

 

 

must be fitted with the correct

 

and set-up properly using

 

 

fuse rating.

 

spiralled hose which

 

 

 

 

 

 

should have a minimum

 

 

 

 

 

 

fall of 3cm per metre.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

34

27

 

 

 

 

 

It is recommended that

The minimum ambient

 

 

 

 

 

 

 

 

the interior of the

temperature should not be

 

 

 

 

storage bin is cleaned

lower than +10˚C and the

 

 

 

 

with an appropriate mild

maximum ambient

 

 

 

 

disinfectant solution.

temperature higher than

 

 

 

 

 

+40˚C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

englishhow the installation is madestart upManual backgroundManual background14Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

20

Water supply connection with shut-off valve.

21

Waste drain water connection.

22

Attention

Make sure that water available is connected to a cold drinking water supply. If in doubt consult the installer for the possible installation of a water filter or water conditioner.

To gain full advantage from this unit in terms of performance and durability also make sure that:

23

Minimum water temperature is not lower than +5˚C and maximum water temperature does not exceed +40˚C.

24

Minimum water pressure is not below 1 bar and maximum water pressure does not exceed 5 bar.

25

The electrical suppy available corresponds to machine specifications as indicated on the unit nameplate.

28

There are no heat sources (kitchen ovens, grills) near the machine and the environment is not too humid.

how the installation is made

Important

The machine installation has to be performed by Authorised Service Personnel

29

Connect the power lead to a suitable electrical supply

30

Check machine is level.

31

The level can be corrected by means of the levelling feet.

32

Make the connection to the water supply using the hoses supplied with the machine.

start up

35

Open water shut-off valve.

36

Plug in machine.

37

Switch the main switch to the ON position.At this stage the unit will start up.

38

The Authorised Service Agent will complete an inspection of the unit interior.

The first batch of ice cubes will drop into the storage bin approximately 30

minutes from start-up. The first batch of ice will

be of poor quality but subsequent batches will be good quality.

39

Attention

If the temperature of the room in which the machine is placed is below +15˚C, the freezing cycle length will be shorter (17 to 20 minutes).

40

Alternatively, if the room temperature is above +30˚C, the freezing cycle length will be longer (25 to 30 minutes).

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background3Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background